Egypt’s Petroleum Minister Karim Badawi held talks with Chevron and Eni executives on Saturday to accelerate development of the Nargis gas field in the Mediterranean, reviewing positive drilling results from Nargis-2 and plans to connect future production to existing offshore infrastructure to reduce costs and shorten development timelines, the Petroleum Ministry said.
The November 21 meeting examined findings from Nargis-2 and compared them with Nargis-1, using seismic data, well logs, pressure tests and geological assessments of the Miocene and Oligocene formations, which indicated potential additional gas resources.
The ministry previously reported that Nargis-2 had reached a depth exceeding 5,000 metres, confirming the extension of previously discovered gas-bearing formations and identifying an additional reservoir. The well encountered up to 35 metres of net gas-bearing formation.
Badawi called for accelerating technical and economic studies, evaluating connections to existing offshore facilities and establishing clear schedules for further development, including planning for the proposed Nargis-3 well.
The minister also stressed the importance of coordination between the petroleum sector and its international partners. Chevron and Eni agreed to continue technical consultations and jointly review development options before selecting a preferred plan. No commercial production date has been announced.
The discussions come as Egypt’s natural gas output reportedly increased by 344 million cubic feet per day in November to approximately 3.8 billion cubic feet daily, its largest monthly gain of 2026, according to data cited by Asharq Bloomberg.
Eight new wells and production-enhancement operations supported the increase, although domestic output still meets only around 60% of demand, leaving Egypt dependent on imported gas.
The government aims to raise domestic natural gas production to approximately 6 billion cubic feet per day by fiscal year 2029/2030. Separately, Egypt has agreed with Weatherford on a programme to restore around 100 inactive wells over 18 months as part of broader efforts to increase domestic energy production.
Accelerating Nargis development forms part of the government’s strategy to bring new discoveries into production, strengthen domestic gas supplies and reduce its import requirements.
Related News:
- Egypt Moves to Accelerate Nargis Gas Development in Mediterranean
- Shell Starts Gas Production at Egypt’s Mina West Field, Targets 160mn Cubic Feet Daily

